2025 Problem Statement
Competition Scoring
ASC Region IV GRADING COMPUTATION SHEETS
Division: Commercial Building
Qualifications Package – pts out of 20 Points
Oral Presentation – pts out of 25 Points
Proposal – pts out of 45 Points
Professionalism/Other – pts out of 10 Points
Note: The total must not exceed 100 Points.
TOTAL SCORE: ________ Points
Qualifications Package Requirements – 20 Points
Please see the detailed Problem statement for specific RFQ requirements, but consider the following:
Requested (fictitious) information will be used to evaluate if your company (team) is qualified and capable of addressing the detailed problem.
The RFQ is used to simulate the “short listing” process in which only those most qualified will be allowed to continue in the bidding, proposing, or negotiating process.
Assume you have not worked directly or indirectly with this owner before.
This is your first opportunity to impress the owner.
The quality and content of the RFQ can often set a precedence of how the owner will view later submissions. How do you want the owner to view your company before they meet you?
2. THE ORAL PRESENTATION – 25 POINTS
Some items to consider when preparing your presentation:
Each speaker will be evaluated based on:
Quality of voice (Projection)
Visual contact
Confidence while speaking
Free from distractions?
Speak for a minimum of 2 min (Only 5 students need to meet this requirement)
Knowledge of subject
Presents on topic that relates to role?
PowerPoint will be evaluated based on:
Organization, appearance, and content
Present the judges with the requested 1-page handout with pictures and project roles?
Does the voluntary handout add to, clarify, and is consistent with the Oral Presentation?
How well was the material presented (as opposed to the content of what was presented)?
Bonus points can be awarded for creativity, exceptional performance, or overall professionalism.
3. WRITTEN PROPOSAL – 45 POINTS
Overall Presentation of the Written Proposal (5 POINTS TOTAL):
Electronic copy submitted as one complete PDF?
All required sections provided?
Correct spelling and grammar?
Quality of graphics?
Does it look professional?
Exceed page limits?
Were comments from the RFQ incorporated?
Bid Estimate / Cash Flow Projections (15 POINTS TOTAL):
Bid Estimate:
All items accounted for?
Reasonable contingency, overhead, and fee?
Consistent with Owner/Contract requirements?
Overall estimate
Cash Flow Projections:
Reflect appropriate duration and budget?
Does it give the owner adequate information to finalize monthly funding requirements?
Easy to read, follow, and evaluate?
Schedule (10 POINTS TOTAL):
Enough detail to provide an evaluation of the accuracy and credibility of the schedule?
Identify critical work items?
Include milestone activities as required?
Is the schedule organized and logical?
Reasonable durations for activities?
In agreement with bidding documents and proposed construction methods?
Safety (5 POINTS TOTAL):
Project specific?
Redundant information from qualifications package?
Lock Out Tag Out plan
Severe weather evacuation plan
Identify potential safety concerns
Plans for site security, equipment safety, or traffic issues
Quality (5 POINTS TOTAL):
Project specific?
Redundant information from qualifications package?
Identify potential quality concerns
Identify which scopes will require mockups or special inspections
Strategies to reduce points of failure
Identify possible scopes that could utilize pre-fabrication
Logistics (5 POINTS TOTAL):
Site/Project specific?
Redundant information from qualifications package?
Marked up plan
Identify major required equipment
4. PROFESSIONALISM / OTHER – 10 POINTS
Here is where the judges must consider anything that deserves to be considered and which has not specifically been considered above.
(Note: Additional positive weighting may be applied for exceptional performance in each area or for overall presentation. Additional negative weighting may be applied for failure to respond to owner’s requests/needs, inconsistencies, or for overall presentation.)
MAKE A PAYMENT